University of Wollongong - Blg18

  • Builder - Patterson Building Group
  • Consultant - Arrow Consulting Engineers

Project Scope

  • Install 2-off air handling equipment
  • Install 1-of evaporative chiller
  • Install 2-of chilled water pumps
  • Install water treatment equipment that includes Stainless Steel buffer tank, dirt separator, chemical dosing pot, pressurization unit and micro bubble deaerator
  • Sheetmetal ductwork for Air handling units
  • Chilled water pipework and insulation
  • Associated electrical installation of one of MSSB
  • Testing and commissioning
  • BMS system
  • Pipework identification
  • Control and wiring diagrams
  • Speed drives for the control