St George Private Hospital
- Builder -
- Consultant -
Project Scope
- Install 2-off air handling equipment
- Install 1-of evaporative chiller
- Install 2-of chilled water pumps
- Install water treatment equipment that includes Stainless Steel buffer tank, dirt separator, chemical dosing pot, pressurization unit and micro bubble deaerator
- Sheetmetal ductwork for Air handling units